Process flow:
Put in PCBA→chemical liquid pre-wash → chemical liquid wash → chemical isolation → DI water pre-rinse → DI water rinse → DI water final rinse → Air blow →hot air dry 1 → hot air dry 2 →send out PCBA
 |
1. Emergency button. (3 for inlet, outlet and operation panel)
2. Import and export radiation sensor: capacity counting, dropping detection, energy saving standby.
3. SUS304 stainless steel mesh. |
Part A: Pre cleaning section & cleaning section

1. There are 2 spray bars at the top and bottom of the pre-cleaning section, and 6 spray bars at the top and bottom of the cleaning section.
2. 7.5KW vertical electric pump.
3. Immersion heating tube, the temperature of the cleaning liquid can be adjusted, and the temperature rises quickly.
4. 2 layers of explosion-proof glass inside + 1 layer of outer door, 3 layers of protection, no liquid odor seepage.
5. The liquid injection pressure can be adjusted, and the spray rod angle can be adjusted.
6. Equipped with a filter barrel, the cleaning liquid is used for circulating filtration.
7. The exhaust outlet is equipped with a long condensation recovery device.
8. Equipped with an external concentrate tank.
9. Equipped with a diaphragm pump, the liquid is automatically added and the waste liquid is automatically discharged.
10. Cleaning fluid pressure detection and feedback
Part B: Chemical isolation section

1. The chemical isolation equipped with a 10HP air blower.
2. 2upper and 1 lower air knives.
3. The angle of the air knives can be adjusted.
4. Electric air pressure meters monitoring air blow pressure.
Part C: Pre-rinse, rinse, final spray rinse section
1. 2 upper/ 2 lower spray manifolds on pre-rinse section.
2. 4 upper/ 4 lower spray manifolds on rinse section.
3. 1 upper/ 1 lower spray manifolds on final rinse section.
4. Different type of spray nozzles combination.
5. 3-stage rinsing, super rinse ability.
6. One 2HPelectric pump on pre-rinse section and one 5.5HP electric pump on rinse section.
7. Pre-rinse DI water and rinse DI water spray pressure are adjustable.
8. Pre-rinse and rinse tank DI water temperature adjustable.
9. The pre-rinse tank has 1 immersed 12KW heater and the rinse tank has 3*12KW immersed heaters, totally 36KW.
10. In the pre-rinse, rinse, and final spray section, the DI water is recycled and overlow to renew in sequence of the Final spray→Rinse
tank→pre-rinse tank→water discharge tank to save the DI water.
11. The final spray of fresh DI water flow is adjustable.
12. DI water conductivity monitoring.
Part D: Final spray rinse (fresh DI water, 1 spray)

1. Finally, the flow meter of spray water control valve is monitored.
2. Spray and rinse fresh DI water to ensure cleanliness, and update front-end rinsing water.
3. Introduction of 6~12L / min DI water.
4. Pressurize to 40-60psi and penetrate the bottom gap of the device.
Effect comparison: